Client : Balfour Beatty Regional Construction Limited
Access company: Wulf Lifting
Access equipment: Demag 220-5 78 meters main Jib with a 21 meter Fly Jib
Site: InterContinental London – The O2
Description of works: 15th-floor replacement ISU, glass lifted from the front entrance of the hotel lifted over the top of the Hotel and lowered to the rear façade of the building.